You've found a nice plot and want to realize the ultimate house. We are happy to assist you to realize that dream together with you. What will the process be and which important moments are there? You'll will find it all in 10 steps.

 

Step 1 - What's your 'Living Dream'?

Together with us, you'll put your wishes and ideas on paper. How you want to live and life, which wisher you have for the future and what this means for your new residence. When necessary, the example houses on our websites can give you some idea. Of course we are always there to help you and to give you advice where necessary.

 

Step 2 - Inspection building plot.

To get a correct indication of the total construction costs, it is important that we can submit the concerning building plot to an overall first research already at an early stage. Our building Engineer will check the ground proposition, slope degree and he maps the possible present building and/or plantation. Because of this we get a good picture of possible - and impossibilities.

 

Step 3 - Your design on paper.

After the inventory in step 1 and the inspection of your plot in step 2, our designers can start with their work. At devising we put your wishes beside the requirements of the destination plan and the outcome of the inspection of your plot. Thus arises a concrete picture of the possibilities, irradiation and classification. We also give directly a tender based on our well-known data. This tender is subject to an independent geotechnical ground research and topographical research, which are obliged in Spain. Our tender however gives a clear picture what your dream house will cost. Furthermore matters such as construction price, maximum construction time and basic material is guaranteed in the tender. Should however at this stage not yet be clear on which location your dream house must become realised, then the costs for slope construction and/or cleaning the plot, are assessed.

 

Step 4 - On the way to cooperation.

When you decide to build your dream house whit us, we will formalise the appointments and will concretise the design in detail. Thereby it concerns especially the use of colours and the material choices for the outside of the house: tiles, stones, casings, windows, doors, etc. On that basis our architect makes an elaborated design, on basis of which the Council of Architects and the municipality grant its approval. All conceivable material choices you can find in our showroom, so that you can see exactly how your bathroom or flag partition can be. When our architect is finished with the design, he will presented first to you for your approval. After your approval has been given, the proposal is submitted for control to the Council of Architects.

 

Step 5 - To the Council of Architects.

In Spain house projects are assessed by the Council of Architects. The Council of Architects assesses the house design on the quality of the architecture and the consistency with the surroundings. Because we build nationally we know most of the architects personally, and we know to which requirements request the design must satisfy. We submit your claim, therefore you don't have to do anything by your self. We take care of everything: design - and diagrams, material choices, colour diagram, situation and the explanation on the design. When the Council of Architects wants to modify something, we go through that of course firstly with you.

 

Step 6 - De construction preparation.

The definite design can now be translated in specifications drawings. These forms for their part the basis for the working plans, which exactly indicate how the house must be built in detail. At this stage you get acquainted also with your own construction speculator. As contact person and specialist in finishing, he recommend you at all architectural choices which are now made. Such as the classification of and control course at the kitchen and bathroom, the exact location of bright spots, switches and power points, and the turn direction of windows and doors.

 

Step 7 - De building license.

Now we know the finishing desired by you, pieces all technical pieces, which belong at the construction process, are are possible to be fixed. Beside the working plans that are among other things the specifications (description of the construction, required materials and finishing), sewerage plan, the calculation of the construction and energy performance standard, etc.. Afterwards we apply the construction license for you and order all required material. Also the planning of the logistics and the commitment of people starts at this stage.

 

Step 8 - The finishing touch.

With your construction speculator and if required our decorator, now you stipulate the detailed finishing of your house (this is of course also earlier possible, in step 5). Think of the kitchen with associated equipment, the bathroom including all sanitary and flag work, and other matters such as partitions, floors, ceilings, doors, central substance piston system, air conditioning, central heating or Domotic alarm installation. In our showroom everything is visible and applied in detail, so that you yourself can see what you choose and how that happens in practice.

 

Step 9 - The first stone.

If the construction license has been delivered and all preparations has been finished, the construction starts. For that we invite you of course personally! At the start of the construction the municipal foreman and the executants are also present. With them you will set up the building lines. Obvious we hope that you will put the first stone yourself. In the continuation you can maintain direct contact with your executants if it concerns matter which is related to the implementation of construction. As soon as masonry gets sufficiently form and the run-down is in preparation, we gladly invite you again. The executants runs departure for departure with you and agreed finishing once more with you. If you nevertheless still wants to carry out some modifications, then that is no problem. We wants that you are happy whit your new home. Of course we will keep you informed, by means of a weekly digital photo shooting.

 

Step 10 - The key in your hands.

Approximately a week for the official delivery of your house, we will clean your house thoroughly. With the executants you follow the whole house once more thorough. Should you discover still small imperfections, we will repair these, if possible, in the following week will remedy. Afterwards the definite delivery follows. Thereby you can let yourself of course be assisted by an external consultant. Gladly even, what concerns us. With you this specialist inspects the house once again thorough. The possible observations are noted and are settled. As everyone is satisfied, you receive the key and you can move into your new Spanish dream house.

 

NederlandsEnglishCastellano

.:. Our villas

.:. About Confort Villa

.:. The way we build

.:. Choice for reliability

.:. Choice for quality

.:. Renovation & projects

.:. Purchase Assistant

.:. Where can you find us

.:. General Conditions

.:. Contact us

Costa Brava

Avda. Diagonal 440

08037 Barcelona

Spain

Costa Blanca

Gran Via 6

03002 Alicante

Spain

Costa del Azahar

Calle San Rafael s/n

46011 Valencia

Spain

Tel.

:

+34 634 830 531

Fax

:

+34 965 995 121

E-mail

:

info@confortvilla.com

Internet

:

www.confortvilla.com